Revealing two corruption incidents involving one contractor in Crater Aden

Lawyer and human rights activist Afraa Hariri said that the capital, Aden, will not be fine in light of the corruption of sheriffs and general managers throughout the directorate.
Hariri accused a number of general district officials of implementing projects randomly, which exposes public money to plundering
Hariri indicated that the asphalt of Luqman Street (Post Street) in Crater, extending from the Central Bank to the Bank Triangle, has a length of 500 meters, the contractor is the Arm Star Contracting Corporation, and the water supply line project for the city of Crater, which is 2,000 meters long, extending from Aqaba to the Central Bank, the contractor is the Arm Foundation. Star Contracting (same contractor).
She stated, "The contractor started the water project from the Central Bank to Aqaba. He cut the asphalt a meter wide, 2000 meters long, and laid the pipes. The asphalt was not restored. Then he implemented the asphalt project on Luqman Street. He removed the old asphalt and replaced it with new, killing two birds with one stone, as he received it from the Foundation." Water: The value of re-asphalting a length of 500 meters is $50 per meter, for a total of $25,000, and I received the value of asphalting the entire street from the directorate without discount.”
Hariri described the amount of the water project as double corruption between the water director and the director of the directorate.