Work continues at the axial weighing station in Mokha

Continuing work is being carried out by the work team at the axle weighing station in the Al Mokha District in Taiz Governorate to control the excess weights of heavy transport vehicles, in the campaign led by the Road and Bridge Maintenance Fund, the main center in the capital, Aden, to protect the roads and their safety from destruction..
In this regard, the station director, Abdul-Ghani Al-Shehab, explained that the efforts of the weight control and regulation campaign are continuing on the Mokha Road to control excess weights and loads that violate the law of weights and overall dimensions of road transport vehicles.
Al-Shehab added that operations to control illegal loads are dealt with in accordance with the law, in which the excess loads are unloaded and unloaded according to the specified weight of the various large, medium and small axle vehicles. He pointed out that the current work at the station is now proceeding in full swing according to the directives of Engineer Moeen Al-Mas, Chairman of the Board of Directors. Road Fund and Engineer Muhammad Hassan Hussein, Director General of Axial Weighing Stations.
It is noteworthy that the axle weighing station inaugurated in Mokha is one of the stations that the Fund inaugurated in the governorates at the beginning of this year, aiming to reduce the causes of the deterioration of the national road network as a result of the excessive weight passing over it..