After installation

With the directives of His Excellency the Minister of State, Governor of Aden, Mr. Ahmed Lams, and the direct supervision of the Director General of Electricity Electricity, Mr. Salem Al -Walidi, the technical inspection and distribution teams of Aden Electricity (the second region) continued their intensive campaign to remove the indiscriminate and double electricity of the electricity in the Dar Saad district, specifically In the meat area, behind the Al -Salam Petroleum Station (Hadar adapter).
The campaign came as part of the efforts to combat random fastening, which causes significant financial losses to the institution, in addition to the destruction of the network assets and the increase in electric current. Mr. Abdullah Al -Shaabi, Director General of the second region of Aden Electricity, stressed that the campaign aims to reduce the excess load on the electricity lines and ensure the continuity of obstetrics, calling on citizens to review the region to complete the procedures for legal delivery, especially after the installation of a new transformer for the neighborhood with a capacity of 1000 kV.
The technical inspection teams and the distribution department participated in the campaign in coordination with the security authorities in the Dar Saad district, where the illegal linking operations were successfully carried out, amid security measures to protect the staff.
Al -Shaabi explained that the campaign will continue in the directorates subject to the second region, stressing that Aden electricity is working to implement deterrent measures against violators in cooperation with legal affairs.